Crack Stitch Case Study

Loading Dock

 

Location: Medical College of Wisconsin Loading Dock

Contractor: Cornerstone Restoration

Project Scope: This loading dock contain inadequate steel in the concrete.  Opening and closing of the concrete under vehicle traffic was leading to severe cracking. An early version of the Crack Stitch was used along with epoxy injections to repair the slab.

After installation an overlay can be installed for aesthetic reasons, which was not completed at the time of installation.

Why Crack Stitch:
Crack Stitch offers a permanent solution for cracked concrete, effectively redistributing stress and preventing further cracking. Its ease of installation and lasting durability make it the ideal choice for concrete repair professionals.

Looking to tackle cracked concrete? Discover the power of Crack Stitch for yourself and become an approved contractor today!

Installation Photos - Click to expand